HVAC and BMS integration in Azerbaijan
HVAC BMS integration in Azerbaijan: AHU, FCU and chiller controls, BACnet/Modbus compatibility, field signals, alarms and commissioning support.
Discuss your projectBuilding services under coordinated control
SR Project connects HVAC equipment to building automation where its controller, interface and documentation support the required data exchange. The scope starts with the AHU, FCU, chiller or VRV/VRF equipment schedule and the operating sequence for the building.
Interfaces and field signals
We assess BACnet or Modbus compatibility, available gateways, point lists and controller configuration. Equipment without a suitable digital interface may require agreed hardwired status and command signals. A gateway alone does not guarantee full interoperability; readable points, writable setpoints and equipment permissions must be checked.
Alarms, trends and commissioning
The BMS scope can include temperature and pressure readings, fan and pump feedback, valve and damper commands, operating schedules and alarms. Trend collection is configured for the agreed points and sampling needs. End-to-end testing checks that the displayed condition and commanded action match the field equipment.
Prepare your integration enquiry
Send the equipment brands and models, controller or gateway details, protocol documentation, point lists and existing BMS information. Describe whether you need a new integration, troubleshooting or modernization. SR Project confirms the supported points, access requirements and commissioning scope before offering the work.
Related services and equipment
Discuss your project
Send the technical requirements and equipment models to info@sr-project.com.
Discuss your project